I’ve finally got it exactly as I want it.
Total build time must have been 40 hours.
Cost? loads and loads!
I’ll be doing a Samurize video (the software used on the 7″ Xenarc LCD) soon for those who want to know.
Temp gagues are from ebay.
Fan controller is a Zalman ZM-MFC1 plus
This article was gathered automatically by our news bot. We help YouTubers by driving traffic to them for free. The featured image in this article is the thumbnail of the embedded video. Thank you for visiting the Midwest Sports Network and mwsn.net. For more sports, news, and entertainment, follow us on Twitter @MWSNsports or like our page on Facebook.